Harwood-Waelder 69kV Transmission Line Upgrade Project

Type:听罢谤补苍蝉尘颈蝉蝉颈辞苍
Scope: Constructed 13.9 miles of 69kV energized transmission line and conductor upgrade.鈥
Location: Hardwood, Texas
Client: Lower Colorado River Authority

The (“LCRA”) is a nonprofit public utility established to provide quality of life to Texans through water stewardship, energy, and community service.

In November 2017, LCRA contracted 新香港六合彩开奖直播 to upgrade a 13.9 mile 69kV transmission line between its Harwood and Waelder substations to 138kV capable. The 新香港六合彩开奖直播 scope included the replacement of 112 structures to complete the conductor upgrade and the installation of OPGW shield wire from Waelder to Flatonia substations.

The 新香港六合彩开奖直播 upgrades (including foundations, tangents, and dead ends) were performed on energized lines with support from and (Both 新香港六合彩开奖直播 and Probst are companies (PWR:NYSE)). Completed to schedule in May 2018, the project was delivered to budget and with zero lost time incidents.

Start Date: November 2017
Completion Date: May 2018

 